East 14th Street Park

A New Park for Ashland Un Nuevo Parque para Ashland

Great News!!! 

E 14th Street Park project is recommended by California State Parks for a $3,997,500. Land and Water Conservation Fund (LWCF) for design and construction!

The project is also awarded a $883,914 Equitable Community Revitalization Grant (ECRG) from Department of Toxic Substances Control for soil cleanup work at the site!

E14th Site Flyer Mural Only_Page_1

Following the success of being awarded a competitive State Prop 68 grant for the Ashland Mateo Street Park project, Hayward Area Recreation & Park District (HARD) and the Trust for Public Land (TPL) are partnering again on the community engagement and park planning for more parkland in the Ashland community.  The newly acquired park site is located on E 14 Street near Ashland Ave, continuous with the  future Mateo St Park.

A raíz del  éxito de ser concedido una competitiva subvensión del Estado Propocisión 68 para el Proyecto Ashland Mateo Street Park, Hayward Area Recreation & Park District (HARD) y el Trust for Public Land (TPL) están colaborando otra vez sobre el compromiso de la comunidad y planificación del parque para más área del parque en la comunidad de Ashland. El nuevo sitio del parque adquirido esta localizado en E 14 Street cerca de Ashland Ave., continuo al futuro Parque de Mateo St

The new E 14th Street Park site is about 1.7 acres in size, larger than any of the existing or the future parks in Ashland. (Jack Hollard Park and the Edendale Park are each about one acre.)  E 14th Street Park site critically and physically ties two important developments in the community: the proposed and fully funded  1.4-acre Mateo Steet Park to its east, and the proposed Madrone Terrace, an affordable housing development and community center to the south.  Located in the heart of Ashland,  this combination of facilities will greatly enhance  open space and recreation access for the community. 

El nuevo sitio del parque en E. 14th Street es alrededor de  1.7 acres, más grande que cualquier otro parque que existe ahora o en el futuro de Ashland. (El parque de Jack Holland y de  Edendale son alrededor de un acre.) El sitio del parque de  E 14th Street  criticamente y fisicamente ata a dos important desarrollos en la comunidad: la propuesta y totalment financiada  1.4-acres que es el Parque Mateo Street al este, y la propuesta de Madrone Terrace,  un  desarrollo de vivienda y centro de comunidad que está al sur.  Localizado en el corazón de Ashland.  Esta combinación de instalaciones mejorará en gran medida el espacio abierto  y al acceso de recreación para la comunidad. 

We invite you to help create a great park that all members of the community will enjoy. Your participation will be critical in applying for an Equitable Community Revitalization Grant (ECRG) to clean up the site soil and a development grant from the competitive Federal Land and Water Conservation Fund (LWCF).

Le invitamos a que usted ayude a crear un gran parque que todos los miembros de la comunidad puedan disfrutar. Su participación sera critica para poder aplicar para una subvensión de desarrollo para el competitivo  Fondo Federal para la Conservación de Tierras y Aguas.

site context

Schematic Concept Plan 2023 06 05_s (002)

Draft E 14th Street Soil Mitigation Corrective Action Plan (Link to Document)

Public Comment Period: SEPTEMBER 20 – OCTOBER 20, 2023
All comments must be received by 5 p.m. on October 20, 2023, sent to:
Drew York , ACDEH Case Manager
Andrew.York@acgov.org

Environmental investigations conducted at the Site indicate that the soil is contaminated with lead and arsenic. This soil needs to be addressed before the Site can be developed into a park.  

In advance of the park construction, HARD will clean up the Site by removing contaminated soils. The clean-up is funded through an Equitable Community Revitalization Grant issued by the California Department of Toxic Substances Control.

HARD and its consultants have prepared a Remediation Soil Excavation Plan, which proposes the following measures:
• Remove soil with arsenic and lead to a depth of 1 to 1.5 feet across the Site;
• Dispose of excavated soil at an off-site, licensed facility; and
• Backfill excavations with clean, imported soil.

Soil excavation and removal work is anticipated to start in winter 2023 and will last for 6 weeks. Park development project is anticipated to start in 2025.


El borrador del Plan de Excavación de Suelos para Remediación (Link to Document)

Período de comentarios del público: 20 DE SEPTIEMBRE – 20 DE OCTUBRE DE 2023

Todos los comentarios deben recibirse antes de las 5 p.m. el 20 de octubre de 2023, enviados a:
Drew York , ACDEH Case Manager 
Andrew.York@acgov.org

Las investigaciones ambientales realizadas en el sitio indican que los suelos están contaminados con plomo y arsénico. Es necesario tratar estos suelos antes de que el sitio pueda convertirse en un parque.

Antes de la construcción del parque, HARD limpiará el sitio mediante la eliminación de los suelos contaminados. La limpieza se financia a través de una Subvención Equitativa de Revitalización Comunitaria (Equitable Community Revitalization Grant) otorgada por el Departamento de Control de Sustancias Tóxicas de California (California Department of Toxic Substances Control).

HARD y sus consultores han elaborado un Plan de Excavación de Suelos para Remediación, que propone las siguientes medidas:
• Remover los suelos con arsénico y conducir a una profundidad de 1 a 1.5 pies en todo el sitio;
• Eliminar la tierra excavada en un vertedero autorizado fuera del sitio; y
• Rellenar las excavaciones con tierra limpia importada.

HARD anticipa los trabajos de excavación y remoción del suelo comiencen en el invierno de 2023 y duren 6 semanas. La construcción del parque comenzará en 2025
.


Past Presentation

    6/5/2023 Board Study Session: Schematic Design Plan PDF (Link to Document)

    Concept Plan PDF:(Link to Document)

    Board Study Session Presentation PDF: (Link to Document)

    1/13/22 Virtual Design Workshop English Recording: Coming Soon

    1/13/22 Virtual Design Workshop Spanish Recording: Coming Soon

    Concept Design Options PDF:(Link to Document)

    Design Workshop Presentation PDF: (Link to Document)

    1/6/22 Virtual Design Workshop English Recording: Coming Soon

    1/6/22 Virtual Design Workshop Spanish Recording: Coming Soon

Presentación pasada

    El plan conceptual PDF (link) enlace al documento

    Presentación del sesión de Estudio de la Mesa Directiva de HARD PDF enlace al documento

    1/13/22 Sesión de Estudio de la Mesa Directiva de HARD grabacion ingles:  próximamente

    1/13/22 Sesión de Estudio de la Mesa Directiva de HARD grabacion española:  próximamente


    Opciones de diseño de concepto PDF: enlace al documento

    Presentación del taller de Diseño PDF: enlace al documento

    1/6/22 Taller de Diseño Virtual grabacion ingles: próximamente

    1/6/22 Taller de Diseño Virtual grabacion españolapróximamente

¿Preguntas? a  Hai-Ping Momoha@haywardrec.org 

Questions? Please Contact Hai-Ping Mo, moha@haywardrec.org